Client: ALBERTI
Site: Bulding demolition - 120m x 30m x 15 m located in small village La Fous d'Allos.
Mission: Setting up of the safety and blasting procedures and realized all opeartions
Resources: Two specialist engineers seconded to the site for three weeks - Use of demolition simulator software
|
 |
Client: ARCELOR MITTAL
Site: Demolition studies about Hamon and Balcke tours- .
Mission: Setting up of the safety rays and seismic procedures realized around Differdange village - Luxembourg
Resources: Two specialist engineers seconded to the site for three weeks - Use of demolition simulator software
|
 |
Client: BOUYGUES OFFSHORE (Bouygues Group)
Site: construction of an oil complex in Russia, on the banks of the Caspian sea. (Contractor: SCO)
Mission: Setting up of blasting procedures and sizing the blasting operations
Resources: One specialist engineer seconded to the site for two weeks - Use of Qualitir and Wipfrag software, VOD measuring instrument and seismographs
|
 |
Client: DELTA CAPS INITIATORS
Chantier: Blasting audit
Mission: Blasting audit and training about the way to use DELTADET electronic detonator.
Moyen: One specialist engineer seconded to the site for 15 days.
|
 |
Client: DID (Departmental Infrastructure Authority)
Site: Blasting of an unstable scale (2000 cu. m.) overhanging above a road and an electricity plant.
Mission: Three-dimensional sizing of the scale, sizing of the blasting operations, vibration measuring, loading and blasting with acrobatic work.
Resources: Two specialist engineers seconded to the site for 20 days.
|
 |
Client: DRAGADOS-SELI (Spain-Italy)
Site: Construction of underground pits and galleries (France and Switzerland) for CERN
Mission: Test blasting to establish the seismic propagation law in order to determine the feasibility of using explosives close to the existing installations.
Resources: One specialist engineer seconded to the site for 1 day - Use of 10 seismographs
|
 |
Client: DTP (Bouygues Group)
Site: Construction of a motorway section in Istria (Croatia)
Mission: Sizing of the blasting procedures - Main contractor for blasting operations
Resources: One specialist engineer seconded to the site for 1 month
|
 |
Client: DTP (Bouygues Group)
Site: Tai Lam Project - Road3 - Construction of a motorway between the new airport and the new territories (130 mē of tunnel and one cut equal to 3 million cu. m.)
Mission: Sizing of blasting operations (cut) and survey
Resources: One specialist engineer seconded to the site for 3 weeks
|
 |
Client: Lafarge Cement Group
Site: Quarry
Mission: Assistance to the company in blasting operations
Resources: : One specialist engineer seconded to the site for blasting
|
 |
Client: Lafarge Cement Group
Site: Chalk quarry
Mission: Assistance in blasting - tracking and optimising vibrations
Ressources: One specialist engineer seconded to the site regularly
|
 |
Client: Lafarge Granulate Group
Site: Construction of a storm tank (10,000 cu. m.)
Mission: Test blasting - sizing the blasts in a sensitive environment - blasting
Resources: One specialist engineer seconded to the site for the operations- Use of sequential blasting
|
 |
Client: LEDUC
Site: Construction of an Exported Gas Terminal - YLNG Project - Yemen
Mission: Test blasting - sizing the blasts in a sensitive environment due to biodiversity of coral reef
Resources: One specialist engineer seconded to the site for the operations - Use of hydrophone and seismic network
|
 |
Client: CARI (Groupe TARMAC TP)
Site: Construction of a technical trench in an urban site - Monaco
Mission: Test blasting and sizing the actual blasting in accordance with the stringent constraints applicable (7 mm/s) in Monaco.
Resources: One specialist engineer seconded to the site for the operations - Setting up 15 sensors and 3500 metres of cable
|
 |
Client: OCP Group (Cherifian Phosphate Office - Morocco)
Site: Working of an open-cast phosphate mine in several sites in Morocco.
Mission: Assistance and consultancy for blasting operations.
Ressources: Specialised engineers seconded to the site during the operations
|
 |
Client: SERFOTEX
Site: Construction of a motorway - A87 (France)
Mission: Survey as part of a blockmetry analysis of a number of different materials
Resources: One specialist engineer - Implementation of Wipfrag software for granulometry analysis using photo analysis.
|
 |
Client: SOLETANCHE
Site: Sizing blasting procedures with up and down method. Blasting operation close to young concrete
Mission: Survey as part of a vibration analysis
Resources: One specialist engineer during all blasting operation.
|
 |
Client: SOLETANCHE BACHY TUNNELS
Site: Sizing blasting procedures, seismic monitoring network via GSM (25 units in real time) linked to personnal computer
Mission: Survey as part of a vibration analysis
Resources: One specialist engineer during all blasting operation (18 months).
|
 |
Client: VICAT
Site: Blasting operation close to buildings and tanks
Mission: Definition of demolition procedures and blasting operation regarding a severe environment.
Resources: Three specialist engineers and one blaster during all blasting operation.
|